At this very moment the rail connection Suvarnabhumi - BKK is "under construction". I cycle past large part of the proposed track most every day. Nothing remotely close to being finished. They're not even laying the pilons as yet. Will take at least a full year, most likely a lot longer before it is ready.
Road connection: Exactly the same. "Under Construction". There is a road connection, yes. If you care to spend several hours stuck more solid than the concrete on the runways is.
Even assuming everything else is finished on time, one still has nothing. Unless one is choppered in and out.
|